Pinewood Home Construction 01

The Construction Pad Must Be Level and On Grade at All Corners of the Construction Area. Pads Must be Built Up with Sandy Clay Fill Material and be Elevated 4" Above The Existing Native Soil. Pads Should Extend 3' to 6' Past All Points of The Construction Area/Perimeters and Preferably Slope Downward From All Points of Construction.