Bass Log Homes

Pinewood Home Construction 05

Pictured Above and Below is Our Sub-Floor System, Supported by Either Solid Concrete Blocks and Pads, or Poured Concrete Piers. The Blocks/Pads, and or, Poured Concrete Piers, are Constructed on 6' & 7' Centers Assuring Maximum Support for the Floor System and Ultimately, the Home. The Stringers in the Sub-Floor System are Double and Triple 2x6's on 7' Centers. The Floor Joists are 2x6's on 16" Centers. We use 3/4" tongue& Groove Sturdiboard for Our Sub-Floor. The Plywood is Attached with Liquid Nails and Fastened with Ring Shank Nails.